• Welcome to Benayat
  • Login
  • Sign Up
  •   عربي
  • Visit Government Land Investment Platform
  • HOME
  • ABOUT
    • About Benayat
  • SERVICES
    • Engineering Offices
      • New Construction
      • Big Addition
      • Small Addition
      • Telecommunication Tower
      • Reclamation
      • Other Permits
      • Net Metering
      • Consultation
      • Track Applications
    • Property Owners
      • Small Addition
      • Other Permits
      • Track Applications
    • General Services
      • Bahrain Map
  • INFORMATION
    • Building Codes
    • Building Permits Process Diagram
    • Building Permit Process Description
    • Pre Approval Process Description
    • Licensed Engineering Offices
  • HELP
    • FAQ
    • Contact Us
Benayat Services
Engineering Offices
Property Owners
Bahrain Map
  • MANAMA, BAHRAIN
  • +973 - 17155363
  • benayat@iga.gov.bh
Tawasul-National suggestions & complaint system
  • Version: 28.11.2024.1

Engineering Offices Services

Property Owners Services

Helpful tips before applying

  • View the property’s specific building requirement through the Bahrain Map tool
  • Identify the zoning of the property and ensure that it does not fall within a “Freezed Zone”
  • Ensure the validity of the commercial registration and Industrial License in case your property is located within Industrial zoned lands managed by the Ministry of Industry, Commerce and Tourism
  • Consult the concerned government entity to obtain clarifications on any requirement
  • View the mandatory requirements of the Green Building Code

Although not mandatory, we also highly recommend that you consult the concerned entities regarding the following particulars:

  • Availability of electricity network
  • Availability of water network
  • Presence of any electricity or water network conflict
  • Whether an electricity substation is required
  • Compliance of electricity substation design (if applicable)
  • Sewage connection points
  • Road level

Proceed

Helpful tips before applying

  • View the property’s specific building requirement through the Bahrain Map tool
  • Identify the zoning of the property and ensure that it does not fall within a “Freezed Zone”
  • Ensure the validity of the commercial registration and Industrial License in case your property is located within Industrial zoned lands managed by the Ministry of Industry, Commerce and Tourism
  • Consult the concerned government entity to obtain clarifications on any requirement
  • View the mandatory requirements of the Green Building Code

Although not mandatory, we also highly recommend that you consult the concerned entities regarding the following particulars:

  • Availability of electricity network
  • Availability of water network
  • Presence of any electricity or water network conflict
  • Whether an electricity substation is required
  • Compliance of electricity substation design (if applicable)
  • Sewage connection points
  • Road level

Proceed

New Application

New Construction

Apply for a new construction building permit

Addition

Apply for a big or small addition building permit