Small Addition Service

It is a service that aims to grant a permit for the possibility of adding a vertical expansion (adding a floor/or several floors) or horizontal expansion to an existing building, considering that the addition’s total area does not exceed 50 square meters.

  • Real estate owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Commercial Entities
  • Government Entities
  • Real estate owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Engineering offices
  1. Preparing engineering drawings
  2. Property owners must engage an Engineering office licensed by Kingdom of Bahrain’s “The Council for Regulating the Practice of Engineering Professions”, to prepare all necessary drawings and documents required since a stamped drawing is required in order to apply for a small addition building permit.

  3. Submitting the Application Electronically
  4. Property owners can submit their application through the system directly. Alternatively, the engineering office responsible for architectural drawings can submit the application through the Benayat System based on the agreement between the owner and the office. For small additions, the engineering office will handle all necessary tasks for applying for the building permit on behalf of the property owner (Click here to view list of the licensed engineering offices).

  5. Small addition request stage
  6. The Property owner / or engineering office should enter the required information for the request in this stage, which includes:

    • The applicant and the property owner or his representer details
    • Other owners or inheritors details (If any)
    • Current property details (Land details)
    • Project details
    • The required addition details
    • Civil aviation details (If required)
    • Electrical Load details (If required)
    • Water demand (If required)
    • Required documents

  7. Review Stage
    1. Initial review stage:

      The request will be initially reviewed by the concerned municipality based on the location. Once approved, the request will proceed to the consultation stage.

    2. Consultation stage:
      1. Internal consultation (Inspection) – If required:

        Based on the request condition, the request will be inspected by the concerned Municipality.

      2. External consultation (concerned government entities) – If any:

        Based on the request pre-defined conditions, the request will be distributed to the concerned Governmental entities automatically. These conditions and cases are outlined in the below table:

    Entities Special Cases Details Government Processing Time
    Urban Planning Development Affairs (UPDA)
    Special Projects 3 Working days
    Airport Zone 3 Working days
    Graveyard 3 Working days
    Implementation Stage 3 Working days
    Roads Planning & Design Directorate (RPDD)
    1. If the parcel falls in RPDD specified fencing area
    2. And if the addition is located on the ground floor

    Note: the request will be distributed to RPDD based on the above condition and as directed by the Municipality concerned engineer.

    3 Working days
    Supreme Council for Environment
    1. If the usage nature: Seaport
    2. If the addition is horizontal (the addition is located on the ground floor)
    3 Working days
    Ministry of Oil and Environment

    If parcels are falling under fencing area specified by Tatweer and BAPCO.

    3 Working days
    Civil Aviation Authority

    If the parcel falling Within the areas around the airport specified by civil aviation with the permissible heights:

    • If the addition exceeds the permissible heights specified in civil aviation maps.
    • If the facility is commercial or industrial and contains a warehouse to store dangerous or radioactive materials (this is applicable in the areas specified by the Civil Aviation even if the height within the approved height).
    3 Working days
    Bahrain Authority of Culture and Antiquities (BACA)
    • If the parcel falling Within BACA fencing area and the addition is located on the roof of a building or cause changes in interfaces.
    • If the building age is 50 years or more (This is applicable in all Kingdom of Bahrain areas).
    3 Working days
    Ministry of Industry & Commerce

    If the parcel is within the industrial areas specified by the Ministry of Industry and commerce.

    3 Working days
    Electricity Distribution Department at (EWA)
    • If an additional electrical load is requested with the addition.
    • If a new address added.
    • If an addition request submitted without an electrical load for the second time.
    3 Working days
    Water Distribution Department at (EWA)
    1. If additional water request required.
    2. If a new address added.
    3 Working days
    General Directorate of Civil Defense- Ministry of Interior
    1. If the parcel affects stairs, exits, and escape routes.
    2. If the parcel includes a change in the height of the roof or building
    3 Working days
    Ministry of Finance & National Economy

    If the owner is a government entity.

    3 Working days

  8. Payment stage
  9. The Property owner / or engineering office should pay the required fees in order to issue the Building Permit automatically from the system, which includes:

    • Small Addition Building Permit Fees: These fees are to be paid online through the system as calculated as per building permit fee schedule.
    • Building Permit insurance Deposit: The deposit amount is to be paid online via the building permit system.
    • Civil Aviation Fees (If applicable): fixed fees (BD 100) to be paid online via the building permit system.
    • Road occupation service fees (if applicable)
    • Advertisement service fees: As needed if the applicant is an engineering office.

  10. Issue Small Addition Building Permit electronically.
  11. Once all the small addition building permit fees are paid, the system will instantly issue an electronic small addition building permit. The building permit is valid for one year from the date of issuance.

  12. Print the Building Permit
  13. The applicant can print the building Permit from within the Benayat system after it is issued by clicking on the print tab.

Document Type Mandatory / Optional Comments
Letter of owner* Mandatory Should be signed by all the owners
Title Deed* Mandatory
Ownership Contract Optional If available
Owner & His Representative \ Inheritance ID Cards* Mandatory
Inheritance Document Optional If the applicant was inheritors
Approval letter from Owners or inheritors Optional If there are more than one owner or inheritor in the property
Commercial registration Optional If the applicant ID type is CR number
Latest Land Certificate of Survey from SLRB Optional
Site Photos* Mandatory
Electricity Supply application form / Supplementary Details of Electrical Installation Optional If extra Electrical load is required
Authorization letter Optional
Copy of previously issued Building permits. Optional If any
Copy of previously approved Engineering drawings of the issued Building permits. Optional If any
Drawing for the required addition* Mandatory
Bearing Certificate from an authorized engineering office for addition on the second floor Optional In case the addition is on the second floor
Lease Agreement Document Optional
Aviation warning light drawing/elevation Optional Mandatory for any building height more than 30.0 meters above ground level
Aviation warning light drawing/ Plan Optional Mandatory for any building height more than 30.0 meters above ground level
Others Optional