The purpose of this service is to allow property owners and the engineering offices to apply for renovation permit. The renovation permit is a legal document that gives the right to renovate a building without affecting the structural framework of the building, external building features or components.

  • Owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Commercial Entities
  • Government Entities
  • Owners or inheritors
  • Individuals authorized by the owners
  • Engineering offices
  1. Submitting the Application Electronically
  2. Property owners and engineering offices can submit renovation application through Benayat system directly. Alternatively, the engineering office can submit the application through Benayat system based on the agreement between the owner and the engineering office. The engineering office will handle all necessary tasks for applying for the permit on behalf of the property owner (Click here to view list of the licensed engineering offices).

  3. Initial request stage
  4. The applicant should select renovation service from other building permits service type, and enter the required information for the request in this stage, which includes:

    • Applicant Details
    • Other owners / Inheritors details (If any)
    • Tenant Details (If any)
    • Land Details
    • Renovation Details
    • Electrical Load Details (if needed)
    • Attachments

  5. Review Stage
    1. Initial review stage:

      The request will be initially reviewed by the concerned municipality based in the location within one day. And then the request will be sent to internal consultation if required and for external consultation based on the pre-defined conditions in the system.

    2. Consultation stage:
      1. Internal consultation – If required:

        Based on the request condition, the request will be Inspected by the concerned Municipality.

      2. External consultation (concerned government entities) – If any:

        Based on the request pre-defined conditions, the request will be distributed to the concerned Governmental entities automatically. These conditions and cases are outlined in the below table:

    3. Entities Special Cases Details Government Processing Time
      Ministry of Industry and Commerce (MOIC) If the property located in an industrial area 3 Working days
      Ministry of Finance and National Economy (MOFNE) If the Property owner is a governmental entity And the renovation type is one of the below:
      1. Structural renovation.
      2. Architectural renovation.
      3. Exterior renovation.
      3 Working days
      Roads Planning & Design Directorate (RPDD) In case of requesting to open new entrances 3 Working days
      Ministry of oil & Environment If the parcels falling in the ministry of oil & environment fencing 3 Working days
      Bahrain Authority of Culture and Antiquities (BACA)
      1. If the parcels falling in the fencing and zones specified by BACA
      2. If the building age is 50 years and above or unknown in all areas of the Kingdom of Bahrain.
      3 Working days
      General Directorate of Civil Defense If the renovation request application includes adding or replacing external cladding only 3 Working days
      Electricity Distribution Directorate at EWA In case of additional electrical loads required 3 Working days
      In case no additional electrical load required Auto comments
      Water Distribution Directorate at EWA All requests Auto comments
    4. Final Review Stage

      After receiving all internal and external consultations feedback the concerned municipality will review the application and take the final decision.

  6. Payment stage
  7. The Property owner / or engineering office should pay the required fees to issue the Permit automatically from the system, which includes:

    • Renovation Permit and Insurance Fees: Fees will be calculated as showing in the table below:
    Zones Fee –m2 (Renovation Area) Insurance – m2 (Renovation Area)
    Residential 250 Fils 500 Fils
    Non- Residential 500 Fils One dinar

  8. Issue Renovation Permit electronically
  9. Once all the renovation building permit fees are paid, the system will instantly issue an electronic renovation permit. The permit is valid for one year from the date of issuance.

  10. Print the Permit
  11. The applicant can print the building Permit from Benayat system after it has been issued.

Document Type Type Comments
Letter from owner Mandatory
Title Deed Mandatory
Site Photos Mandatory
Ownership contract Optional In case that the ownership is not transferred in the tittle deed document
Authorization letter Optional If the applicant is authorized by the owner or in case of heirs
Inheritance Document Optional In case of heirs
Electricity Meters Photos Optional In case of additional electrical load is needed
Electrical Load Form Optional In case of additional electrical load is needed
Approval form for Additional electrical loads from the main developer of the property Optional only for special development areas if additional electrical load needed
Other documents Optional

The purpose of this service is to allow property owners and the engineering offices to apply for a merge permit. The merge permit is a legal document that gives the right to merge two or more units.

  • Owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Commercial Entities
  • Government Entities
  • Owners or inheritors
  • Individuals authorized by the owners
  • Engineering offices
  1. Submitting the Application Electronically
  2. Property owners or engineering offices can submit merge application through Benayat system directly. Alternatively, the engineering office can submit the application through Benayat system based on the agreement between the owner and the engineering office. The engineering office will handle all necessary tasks for applying for the permit on behalf of the property owner (Click here to view list of the licensed engineering offices).

  3. Initial request stage
  4. The applicant should select merge service from other building permits service type, and enter the required information for the request in this stage, which includes:

    • Applicant Details
    • Other owners / Inheritors details (If any)
    • Tenant Details (If any)
    • Land Details
    • Merge Details
    • Electrical Load Details
    • Water Demand Details (If required)
    • Attachments

  5. Review Stage
    1. Initial review stage:

      The request will be initially reviewed by the concerned municipality based in the location within one day. And then the request will be sent to internal consultation if required and for external consultation based on the pre-defined conditions in the system.

    2. Consultation stage:
      1. Internal consultation – If required:

        Based on the request condition, the request will be Inspected by the concerned Municipality.

      2. External consultation (concerned government entities) – If any:

        Based on the request pre-defined conditions, the request will be distributed to the concerned Governmental entities automatically. These conditions and cases are outlined in the below table:

    3. Entities Special Cases Details Government Processing Time
      Ministry of Industry and Commerce (MOIC) If the property located in an industrial area 3 Working days
      Ministry of Finance and National Economy (MOFNE) If the Property owner is a governmental entity 3 Working days
      Roads Planning & Design Directorate (RPDD) If new entrances are required 3 Working days
      Electricity Distribution directorate (EDD) at EWA
      1. Request will be sent if extra electrical load is required only
      2. In case of changing usage nature all requests will be sent
      3 Working days
      General directorate of Civil Defense (GDCD) at Ministry of interior All requests will be sent except private residence requests. 3 Working days
      Bahrain Authority of Culture and Antiquities (BACA)
      1. If the property falling Within BACA fencing area.
      2. If the building age is 50 years and above or unknown in all areas of Kingdom of Bahrain.
      3 Working days
      Urban Planning & Development Affairs (UPDA)
      1. Un-zoned lands (Please consult UPDA offline)
      2. Understudy (Please consult UPDA offline)
      3. Freezed zones (Please consult UPDA offline)
      4. unplanned lands (Please consult UPDA offline)
      5. Green build (Please consult UPDA offline)
      6. Mangrove Area (Please consult UPDA offline)
      7. Oil Fields (Please consult UPDA offline)
      8. Protected Areas (Please consult UPDA offline)
      9. Preserved Areas (Please consult UPDA offline)
      10. Special Projects Areas
      11. Public Services Areas
      12. Ministry of Housing Areas
      13. Recreational Areas
      14. Airport Zone
      15. Graveyard Areas
      16. Archaeological Areas
      17. Agricultural Areas
      18. Implementation Stage Areas
      3 Working days
      Water Distribution Directorate (WDD) at EWA All requests 3 Working days
      Vegetation development Directorate (Agriculture)
      1. If the property located within the agricultural classifications
      2. In case of changing usage nature from farm to another usage nature or from another usage nature to farm.
      3 Working days
      Local Agri Production Directorate (Agriculture) In case of changing usage nature and the property located within the agricultural zones. 3 Working days
      Supreme Council of Environment In case of changing usage nature from workshop to factory or from factory to workshop. 3 Working days
      Ministry of oil & Environment In case of changing usage nature and the property located in a Ministry of oil & Environment fencing areas. 3 Working days
    4. Final Review Stage

      After receiving all internal and external consultations feedback the concerned municipality will review the application and take the final decision.

  6. Payment stage
  7. The Property owner / or engineering office should pay the required fees to issue the merge Permit automatically from the system, which includes:

    • Merge Permit Fees
    • Insurance Fees
    Zones Fee – m2 Insurance – m2
    Residential 250 Fils 500 Fils
    Non- Residential 500 Fils One dinar
    • The area will be calculated as: 10% of the total area of the units to be merged.

  8. Issue Merging Building Permit electronically
  9. Once all the merge building permit fees are paid, the system will instantly issue an electronic merge building permit. The permit is valid for one year from the date of issuance.

  10. Print the Permit
  11. The applicant can print the building Permit from Benayat system after it has been issued.

Document Type Type Comments
Letter from owner Mandatory
Title Deed Mandatory
Engineering Drawings Mandatory
Site Photos Mandatory
Electricity Meters Photos Mandatory
Electrical Load Form Mandatory In case of additional electrical load is needed
Ownership contract Optional In case that the ownership is not transferred in the tittle deed document
Authorization letter Optional If the applicant is authorized by the owner or in case of heirs
Inheritance Document Optional In case of heirs
Approval form for Additional electrical loads from the main developer of the property Optional only for special development areas if additional electrical load needed
Other documents Optional

The purpose of this service is to allow property owners and the engineering offices to apply for a separation permit. The separation permit is a legal document that gives the right to separate a structure.

  • Owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Commercial Entities
  • Government Entities
  • Owners or inheritors
  • Individuals authorized by the owners
  • Engineering offices
  1. Submitting the Application Electronically
  2. Property owners or engineering offices can submit separation application through Benayat system directly. Alternatively, the engineering office can submit the application through Benayat system based on the agreement between the owner and the engineering office. The engineering office will handle all necessary tasks for applying for the permit on behalf of the property owner (Click here to view list of the licensed engineering offices).

  3. Initial request stage
  4. The applicant should select separation service from other building permits service type, and enter the required information for the request in this stage, which includes:

    • Applicant Details
    • Other owners / Inheritors details (If any)
    • Tenant Details (If any)
    • Land Details
    • Separation Details
    • Electrical Load Details
    • Water Demand Details (If required)
    • Attachments

  5. Review Stage
    1. Initial review stage:

      The request will be initially reviewed by the concerned municipality based in the location within one day. And then the request will be sent to internal consultation if required and for external consultation based on the pre-defined conditions in the system.

    2. Consultation stage:
      1. Internal consultation – If required:

        Based on the request condition, the request will be Inspected by the concerned Municipality.

      2. External consultation (concerned government entities) – If any:

        Based on the request pre-defined conditions, the request will be distributed to the concerned Governmental entities automatically. These conditions and cases are outlined in the below table:

    3. Entities Special Cases Details Government Processing Time
      Ministry of Industry and Commerce (MOIC) If the property located in an industrial area 3 Working days
      Ministry of Finance and National Economy (MOFNE) If the Property owner is a governmental entity 3 Working days
      Roads Planning & Design Directorate (RPDD) If new entrances are required 3 Working days
      Electricity Distribution directorate (EDD) at EWA
      1. Request will be sent if extra electrical load is required only
      2. In case of changing usage nature all requests will be sent
      3 Working days
      General directorate of Civil Defense (GDCD) at Ministry of interior All requests will be sent except private residence requests. 3 Working days
      Bahrain Authority of Culture and Antiquities (BACA)
      1. If the property falling Within BACA fencing area.
      2. If the building age is 50 years and above or unknown in all areas of Kingdom of Bahrain.
      3 Working days
      Urban Planning & Development Affairs (UPDA)
      1. Un-zoned lands (Please consult UPDA offline)
      2. Understudy (Please consult UPDA offline)
      3. Freezed zones (Please consult UPDA offline)
      4. unplanned lands (Please consult UPDA offline)
      5. Green build (Please consult UPDA offline)
      6. Mangrove Area (Please consult UPDA offline)
      7. Oil Fields (Please consult UPDA offline)
      8. Protected Areas (Please consult UPDA offline)
      9. Preserved Areas (Please consult UPDA offline)
      10. Special Projects Areas
      11. Public Services Areas
      12. Ministry of Housing Areas
      13. Recreational Areas
      14. Airport Zone
      15. Graveyard Areas
      16. Archaeological Areas
      17. Agricultural Areas
      18. Implementation Stage Areas
      3 Working days
      Water Distribution Directorate (WDD) at EWA All requests 3 Working days
      Vegetation development Directorate (Agriculture)
      1. If the property located within the agricultural classifications
      2. In case of changing usage nature from farm to another usage nature or from another usage nature to farm.
      3 Working days
      Local Agri Production Directorate (Agriculture) In case of changing usage nature and the property located within the agricultural zones. 3 Working days
      Supreme Council of Environment In case of changing usage nature from workshop to factory or from factory to workshop. 3 Working days
      Ministry of oil & Environment In case of changing usage nature and the property located in a Ministry of oil & Environment fencing areas. 3 Working days
    4. Final Review Stage

      After receiving all internal and external consultations feedback the concerned municipality will review the application and take the final decision.

  6. Payment stage
  7. The Property owner / or engineering office should pay the required fees to issue the separation Permit automatically from the system, which includes:

    • Separation Permit Fees
    • Insurance Fees
    Zones Fee – m2 Insurance – m2
    Residential 250 Fils 500 Fils
    Non- Residential 500 Fils One dinar
    • The area will be calculated as: 10% of the total area of the separated units.

  8. Issue Separation Building Permit electronically
  9. Once all the separation building permit fees are paid, the system will instantly issue an electronic separation building permit. The permit is valid for one year from the date of issuance.

  10. Print the Permit
  11. The applicant can print the building Permit from Benayat system after it has been issued.

Document Type Type Comments
Letter from owner Mandatory
Title Deed Mandatory
Engineering Drawings Mandatory
Site Photos Mandatory
Electricity Meters Photos Mandatory
Electrical Load Form Mandatory In case of additional electrical load is needed
Ownership contract Optional In case that the ownership is not transferred in the tittle deed document
Authorization letter Optional If the applicant is authorized by the owner or in case of heirs
Inheritance Document Optional In case of heirs
Approval form for Additional electrical loads from the main developer of the property Optional only for special development areas if additional electrical load needed
Other documents Optional

The purpose of this service is to allow Property owners and Engineering offices to apply for change usage nature permit. The change usage nature permit is a legal document that gives the right to change the usage nature of a property.

  • Owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Commercial Entities
  • Government Entities
  • Owners or inheritors
  • Individuals authorized by the owners
  • Engineering offices
  1. Submitting the Application Electronically
  2. Property owners and engineering offices can submit change usage nature application through Benayat system directly. Alternatively, the engineering office can submit the application through Benayat system based on the agreement between the owner and the engineering office. The engineering office will handle all necessary tasks for applying for the permit on behalf of the property owner (Click here to view list of the licensed engineering offices).

  3. Initial request stage
  4. The applicant should select change usage nature service from other building permits service type, and enter the required information for the request in this stage, which includes:

    • Applicant Details
    • Other owners / Inheritors details (If any)
    • Tenant Details (If any)
    • Land Details
    • Change Usage Nature Details
    • Electrical Load Details
    • Water Demand Details (If required)
    • Attachments

  5. Review Stage
    1. Initial review stage:

      The request will be initially reviewed by the concerned municipality based in the location within one day. And then the request will be sent to internal consultation if required and for external consultation based on the pre-defined conditions in the system.

    2. Consultation stage:
      1. Internal consultation – If required:

        Based on the request condition, the request will be Inspected by the concerned Municipality.

      2. External consultation (concerned government entities) – If any:

        Based on the request pre-defined conditions, the request will be distributed to the concerned Governmental entities automatically. These conditions and cases are outlined in the below table:

    3. Entities Special Cases Details Government Processing Time
      Ministry of Industry and Commerce (MOIC) If the property located in an industrial area 3 Working days
      Ministry of Finance and National Economy (MOFNE) If the Property owner is a governmental entity 3 Working days
      Roads Planning & Design Directorate (RPDD) If new entrances are required 3 Working days
      Electricity Distribution directorate (EDD) at EWA All applications 3 Working days
      General directorate of Civil Defense (GDCD) at Ministry of interior All requests are except Private residence requests 3 Working days
      Bahrain Authority of Culture and Antiquities (BACA)
      1. If the building is less than 50 years old and located in urban heritage areas (A) and (C).
      2. If the building age is 50 years and above or unknown in all areas of the Kingdom of Bahrain.
      3 Working days
      If the usage nature is residential or residential apartments, administrative apartments for buildings less than 50 years old and located within historical areas including: (archaeological sites, heritage parks, urban heritage areas list (B)) Auto Comments
      Urban Planning & Development Affairs (UPDA)
      1. Un-zoned lands (Please consult UPDA offline)
      2. Understudy (Please consult UPDA offline)
      3. Freezed zones (Please consult UPDA offline)
      4. unplanned lands (Please consult UPDA offline)
      5. Green build (Please consult UPDA offline)
      6. Mangrove Area (Please consult UPDA offline)
      7. Oil Fields (Please consult UPDA offline)
      8. Protected Areas (Please consult UPDA offline)
      9. Preserved Areas (Please consult UPDA offline)
      10. Special Projects Areas
      11. Public Services Areas
      12. Ministry of Housing Areas
      13. Recreational Areas
      14. Airport Zone
      15. Graveyard Areas
      16. Archaeological Areas
      17. Agricultural Areas
      18. Implementation Stage Areas
      3 Working days
      Ministry of oil & Environment If the property located in a Ministry of oil & Environment fencing areas. 3 Working days
      Vegetation development Directorate (Agriculture)
      1. If the property located within the agricultural classifications.
      2. If changing usage nature from farm to another usage or from other usage to farm.
      3 Working days
      Local Agri Production Directorate (Agriculture) If the property located in a Local Agri Production Directorate fencing areas. 3 Working days
      Supreme Council of Environment If changing usage nature from workshop to factory or factory to workshop. 3 Working days
      Water Distribution Directorate (WDD) at EWA All requests Auto comments
    4. Final Review Stage

      After receiving all internal and external consultations feedback the concerned municipality will review the application and take the final decision.

  6. Payment stage
  7. The Property owner / or engineering office should pay the required fees to issue the Permit automatically from the system, which includes:

    • Change Usage Nature Permit Fees
    • Insurance Fees
    Zones Fee – m2 Insurance – m2
    Residential 250 Fils 500 Fils
    Non- Residential 500 Fils One dinar
    • The area will be calculated as: 10% of the building area.

  8. Issue Change Usage Nature Building Permit electronically
  9. Once all the change usage nature building permit fees are paid, the system will instantly issue an electronic renovation permit. The permit is valid for one year from the date of issuance.

  10. Print the Permit
  11. The applicant can print the building Permit from Benayat system after it has been issued.

Document Type Type Comments
Letter from owner Mandatory
Title Deed Mandatory
Engineering Drawings Mandatory
Site Photos Mandatory
Electricity Meters Photos Mandatory
Ownership contract Optional In case that the ownership is not transferred in the tittle deed document
Authorization letter Optional If the applicant is authorized by the owner or in case of heirs
Inheritance Document Optional In case of heirs
Electrical Load Form Optional In case of additional electrical load is needed
Approval form for Additional electrical loads from the main developer of the property Optional only for special development areas if additional electrical load needed
Other documents Optional

The purpose of this service is to allow Property owners and Engineering offices to apply for a boundary wall permit. The boundary wall permit is a legal document that gives the right to build up a boundary wall around an empty land.

  • Owners including:
    • Bahraini Citizens
    • GCC Citizens
    • Non-Bahraini Residences
  • Commercial Entities
  • Government Entities
  • Owners or inheritors
  • Individuals authorized by the owners
  • Engineering offices
  1. Submitting the Application Electronically
  2. Property owners can submit their application through the system directly. Alternatively, the engineering office can submit the application through the Benayat System based on the agreement between the owner and the engineering office. For boundary wall, the engineering office will handle all necessary tasks for applying for the building permit on behalf of the property owner (Click here to view list of the licensed engineering offices).

  3. Initial request stage
  4. The applicant should select boundary wall service from other building permits service type, and enter the required information for the request in this stage, which includes:

    • Applicant Details
    • Other owners / Inheritors details (If any)
    • Tenant Details (If any)
    • Land Details
    • Attachments

  5. Review Stage
    1. Initial review stage:

      The request will be initially reviewed by the concerned municipality based in the location within one day. And then the request will be sent to internal consultation if required and for external consultation based on the pre-defined conditions in the system.

    2. Consultation stage:
      1. Internal consultation – If required:

        The request will be sent for internal consultation in the concerned municipality as needed.

      2. External consultation (concerned government entities) – If any:

        Based on the request pre-defined conditions, the request will be distributed to the concerned Governmental entities automatically. These conditions and cases are outlined in the below table:

    3. Entities Special Cases Details Government Processing Time
      Ministry of Industry and Commerce (MOIC) If the property located in an industrial area 3 Working days
      Ministry of Finance and National Economy (MOFNE) If the Property owner is a governmental entity 3 Working days
      Roads Planning & Design Directorate (RPDD) All the request 3 Working days
      DPS directorate in EWA All the request 3 Working days
      Ministry of oil & Environment If the parcels falling in the ministry of oil & environment fencing 3 Working days
      Bahrain Authority of Culture and Antiquities (BACA)
      1. If the parcels falling in the BACA fencing (Historical areas) and (historical gardens) send to BACA
      2. Auto comment If the parcels falling in the BACA fencing.
      3 Working days
    4. Final Review Stage

      After receiving all internal and external consultations feedback the concerned municipality will review the application and take the final decision.

  6. Payment stage
  7. The Property owner / or engineering office should pay the required fees to issue the Permit automatically from the system, which includes:

    • Boundary Wall Permit and insurance fees: Fees will be calculated as showing in the table below:
    Zones Fee – Linear Meter Insurance – Linear Meter
    Residential 250 Fils 500 Fils
    Non- Residential 500 Fils One dinar

  8. Issue Boundary Wall Permit electronically
  9. Once all the boundary wall permit fees are paid, the system will instantly issue an electronic boundary wall permit. The building permit is valid for one year from the date of issuance.

  10. Print the Permit
  11. The applicant can print the building Permit from Benayat system after it has been issued.

Document Type Type Comments
Letter from owner Mandatory
Title Deed Mandatory
Survey Certificate or the Master Plan Approved By SLRB Mandatory
Site Photos Mandatory
Ownership contract Optional In case that the ownership is not transferred in the tittle deed document
Inheritance Document Optional In case of heirs
Authorization letter Optional If the applicant is authorized by the owner or in case of heirs
Other documents Optional