The sewage sector does not have an existing sewage system in this area. Please refer to the reconstruction of this area to study the possibility of connecting to the sewage system in this area,
with the need to adhere to the requirements of the sewage sector in the planning permit. By building the area, a reservoir must be built with a drainage hole within the boundaries of the property,
and not more than 3 meters from the boundary of the property overlooking the street, before embarking on housing, and if the analysis tank is not suitable for quantity or The flow quality of the facility,
an alternative exchange system should be established Within the limits of the property, is compatible with the quantity and quality of the flow generated by the establishment,
since the design of the establishment of operation and maintenance of this system rests with the owner.